Siōng-hái kuí-tō kau-thong 4-hō sòaⁿ

Siōng-hái kuí-tō kau-thong 4-hō suàñ (hàn-gú: 上海軌道交通4號線; (teh thong-tshia tsìn-tsîng mā hông kiò-tsò "Bîng-tsu-suàñ 2-kî" (明珠線二期)[4]); ing-gú: Line 4 (Shanghai Metro)) sī tsit-tiâu uì Tiongkok Siōng-hái-tshī tshî-huē-khu Gî-san-lōo tsām [en], iû Siōng-hái Siōng-hái tē-thih [en] îng-ūn ê khuañ-suàñ tē-thih lōo-suàñ, tsuân-tn̂g 2.032 km, lóng-tsóng set-tī 17-tsō tshia-tsām, tī 2005-nî 12-gue̍h 31-ji̍t thong-tshia îng-ūn. 4-hō suàñ sī Tiong-kok tē-it -tiâu tsuân-kok "Tsuân-kok kang-lâng sen-hong-hō [zh]" tē-thih lōo-suàñ[5].

Siōng-hái kuí-tō kau-thong 4-hō suàñ

Gî-san-lōo tsām [en] lāi-pōo ê kíng-kuan.
Ki-pún chu-liāu
Kî-thaⁿ miâM4 (planned name);
Pearl line phase II ((Hàn-gí));
Loop line ((Hàn-gí))
Chāi-tē miâ上海地铁4号线
Chōng-hóngTong-ûn ho̍k-bū-tiong
Só͘-iú-chiáShanghai Rail Transit Pearl Line (Phase II) Development Co., Ltd. (except shared track with line 3 portion)
Êng-ūn tē-khuHuangpu, Xuhui, Changning, Putuo, Jing'an, Hongkou, Yangpu, and Pudong districts, Shanghai, China
Khí-tiám
Chiong-tiám
Continuous loop from/to Pang-bô͘:Stl (terminal for trains to depot)
Chhia-chām26 (of which 9 shared with line 3)
Ho̍k-bū
Ho̍k-bū lūi-hêngUrban rail transit in China Rapid transit
Hē-thóngShanghai Metro Shanghai Metro
Êng-ūn tan-ūiShanghai No. 3 Metro Operation Co. Ltd.
Chhia-lióng ki-tēPuhuitang Depot
Sú-iōng chhia-lióng42 Type A 6-car train
Ta̍k kang Chài-kheh-liōng976,000 (2019 Peak)[1]
Le̍k-sú
Commenced2001 nî;​ 23 nî í-chêng​ (2001)
Khai-thong2005 nî 12 goe̍h 31 ji̍t;​ 18 nî í-chêng​ (2005-12-31)
Last extension2007 nî 9 goe̍h 21 ji̍t;​ 16 nî í-chêng​ (2007-09-21)
Ki-su̍t
Lō͘-soàⁿ tn̂g-tō͘33.7 km (20.9 mi) (of which 11.57 km (7.2 mi) shared with line 3)
Kúi-tō sò͘-liōng2
Kúi-tō lūi-hêngUnderground and elevated (shared track with line 3 portion)
Kúi-tō piau-chún1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines (1500 volts DC)
Sok-tō͘80 km/h (50 mph)
Average speed: 32.7 km/h (20 mph)
SignallingALSTOM/CASCO URBALISTM 200[2] (fixed block CBTC, current)
CASCO Qiji TACS (2025 exp.)[3]

Li̍k-sú ên-kik

Shanghai metro line 4 opening history
SegmentCommencementOpenedLengthStation(s)NameInvestment
Damuqiao Road — Hongqiao Road26 Dec 200031 Dec 20053.94 km (2.45 mi)5Pearl Line (second phase)¥12.6 billion
Hongqiao Road — Baoshan Road11.52 km (7.16 mi)
(tracks sharing)
9Line 3 & 4 realignment project
Baoshan Road — Lancun Road9.76 km (6.06 mi)8Pearl Line (second phase)
Lancun Road — Damuqiao Road22 Oct 200529 Dec 20078.7 km (5.41 mi)4Loop line connector project

October 11, 2009 became China's first national "Worker Pioneer" subway line.

Tshia-lióng

4-hō suàñ le̽t-tshia lóng tshái-iōng A-hîng tshia 6-tsiat pen-tsoo, set-kè sî-sok 80 km/h, uî VVVF kau-liû thuân-tōng, set-kè siū-miā 30-nî. Le̽t-tshia pen-hō tang-tiong 0437-0449 í-king tsioh-tiāu hōo 3-hō suàñ (pen-hō 337-349).

Hiān-miâGuân-miâTsè-tsō-siongTshia-lióng pen-sîngTsè-tsō nî-tāiTshia-lióng tsóng-sòoTsiūñ-suàñ sî-kanLīng-miâ
04A01AC05Tik-kokSiemens6A
(Tc+Mp+M+M+Mp+Tc)
2004-20072-lia̍t (0401,0402)2005-nî 12-gue̍h 31-ji̍tling-tshuì-á
Lám-tshia tsu-tsiu tiān-li̍k ki-tshia [en]26-lia̍t (0403-0428)
04A02Pak-tshia Tiông-tshun kuí-tō kheh-tshia [en]2014-20171-lia̍t (0429)2015-nî 7-gue̍h 100ji̍tPau-kong, Oo-pau-kong
Siōng-hái tiān-khì [de]Alstom [en]13列(0430-0436,0450-0455)
04A01-hîng lia̍t-tshia tshia-siuñ
04A02-hîng tēn-tōng-tshia teh Tiong-san kong-hn̂g
04A02-hîng tēn-tōng kheh-tshia LED

Tshia-tsām tshing-tuañ

Tshia-tsām le̽t-pió

Lia̍t-tshia ūn-tsuán king-keh

Shanghai Metro Line 4 headway[6]
Sî-kanLāi khuan (running clockwise)Guā khuan (running counterclockwise)
Monday - Friday (Working Days)
AM peak7:00–9:00
Linping Road →Century Avenue→ Yishan Road:
About 3 min and 10 sec
Yishan Road → shared track w/ shanghai/3 → Linping Road:
About 3 min and 45 sec
ishan Road - Century Avenue - Dalian Road:
About 5 min and 30 min;
Dalian Road - shared track w/ shanghai/3 - Yishan Road:
About 7 min and 30 sec
Off-peak9:00–17:00About 7 min
PM peak17:00–19:30About 5 min
Other
hours
Before 7:00
After 19:30
About 5 - 12 min
Saturday and Sunday (Weekends)
Peak7:00–21:00About 6 min and 30 sec
Other
hours
Before 7:00
After 21:00
About 5 - 12 min

Ki-su̍t

Ki-tshia tshia-lióng

Shanghai Metro Line 4 rolling stock
SetManufacturerTime of
manufac-
turing
TypeNo
of
car
Assembly[lower-roman 1]SeriesNumberNotes
28Siemens (0401,0402)
CRRC Zhuzhou Locomotive Co., Ltd. (0403-0428)
2004-2007A[lower-roman 2]6Tc+Mp+M+M+Mp+Tc04A010401-0428[7] Original series name: AC05.
In February 2009, 8 trains used on line 2 (numbers: 0225-0232) returned to line 4 (set 04A01; numbers 0421-0428).
14SATCO[lower-roman 3] (0430-0436, 0450-0455)
CNR Changchun Railway Vehicles Co., Ltd. (0429)
2014-2017A[lower-roman 2]6Tc+Mp+M+M+Mp+Tc04A020429-0436
0450-0455
An additional 13 trains (numbers 437-449) will be returned to line 4 after line 3 and line 4 are separated.

Tsìn-ting ki-tshia tshia-lióng

Shanghai Metro Line 4 former rolling stock
SetTsè-tsō-siongŪn-tsok sî-kanHîng-thàiTshia-siunn
ê
pian-hō
Tsoo-ha̍pHē-lia̍tPen-hōPī-tsù
13CNR Changchun Railway Vehicles Co., Ltd. and Shanghai Alstom Transportation CoA6Tc+Mp+M+M+Mp+Tc04A020437-0449Seconded to line 3 (set 03A02; numbers 337-349). These will be returned to line 4 (set 04A02; numbers 0437-0449) after lines 3 and 4 are separated.

Tsù-kái

Tsham-ua̍t

  • Hoàn-slav gí [en] (Huàn-slav gí/Pan-Slavic language)
  • James Rumsey kì-liām-pi [en] (James Rumsey Monument)
  • Chāi-jīm [en] (tsāi-jīm/Incumbent)
  • Hunlân kok-ka phok-bu̍t-koán [fi] (Hunlân kok-ka phok-bu̍t-kuán/Suomen kansallismuseo)
  • Bió-hāu [en] (Bió-hāu/Alma mater/bú-hāu)

Guā-pōo lên-ket