Yusufeli Dam

The Yusufeli Dam is an arch dam on the Çoruh River near Yusufeli in Artvin Province within the eastern Black Sea region of Turkey. The Yusufeli Dam will be the second largest dam within the larger Çoruh River Development Plan, which plans to build 13 dams, of which two are operational and another two are under construction. The dam's main purpose is hydroelectric power production and it will support a 540 MW power station. The dam is controversial because of its projected impact on the biodiversity within its reservoir area along with the relocation of the locals.

Yusufeli Dam
Yusufeli Dam is located in Turkey
Yusufeli Dam
Location of Yusufeli Dam in Turkey
Official nameYusufeli Barajı
CountryTurkey
LocationYusufeli, Artvin Province
Coordinates40°49′02″N 41°38′43″E / 40.81722°N 41.64528°E / 40.81722; 41.64528
StatusOperational
Construction beganFebruary 26, 2013
Opening date22 Nov 2022
Construction cost487 million (approx. US$270 million)
Owner(s)State Hydraulic Works
Dam and spillways
Type of damArch, double-curvature[1][2][3]
ImpoundsÇoruh River
Height270 m (886 ft)
Length490 m (1,608 ft)
Width (crest)15 m (49 ft)
Dam volume2,900,000 m3 (102,412,533 cu ft)
Spillway typeService, controlled chute
Spillway capacity8,000 m3/s (282,517 cu ft/s)
Reservoir
CreatesYusufeli Reservoir
Total capacity2,130,000,000 m3 (1,726,819 acre⋅ft)
Surface area33.63 km2 (13 sq mi)
Power Station
Turbines3 x 180 MW Francis turbines
Installed capacity540 MW
Annual generation1,705 GWh (est.)

On February 26, 2013, the foundation stone was laid in a ceremony attended by Minister of Forestry and Waterworks Veysel Eroğlu and Minister of Labor and Social Security Faruk Çelik. It is expected that the construction of the dam will cost 487 million (approx. US$270 million).[4] The dam's opening date was initially set to May 29, 2018.[5] In 2018, the expected opening date was pushed back to 2021, and the dam became operational at the end of 2022.[6] As of 2023, Yusufeli Dam is the highest dam in Turkey and the 9th tallest dam in the world.[7]

History

The first studies on the Yusufeli Dam were carried out in the 1970s and it was included in the Coruh River Hydropower Development Master Plan in 1982. The feasibility report was completed in 1986 and the project was added to the national plan in 1997.[8]

Design

Situated 70 km (43 mi) southwest of Artvin, the Yusufeli will be a double-curvature arch dam with a height of 270 m (886 ft) from its foundation and 223 m (732 ft) from the river's thalweg (lowest point of river bed). It will have a crest length of 490 m (1,608 ft) and crest width of 15 m (49 ft) while being composed of 2,900,000 m3 (102,412,533 cu ft) of concrete.[8]

The dam's crest will sit at an altitude of 715 m (2,346 ft) above sea level while the normal operating level of its reservoir will be 710 m (2,329 ft), maximum will be 712 m (2,336 ft) and the minimum 670 m (2,198 ft). The reservoir surface area of 33 km2 (13 sq mi) will have a total storage capacity of 2,130,000,000 m3 (1,726,819 acre⋅ft) and an active or "useful" storage of 1,080,000,000 m3 (875,570 acre⋅ft). The dam's spillway will be a service controlled chute type with a maximum discharge capacity of 8,000 m3/s (282,517 cu ft/s).[8]

The dam will have an underground power station that is 110 m (361 ft) long, 21.4 m (70 ft) wide and 45.2 m (148 ft) high. Within the power station will be 3 x 180 MW vertical shaft Francis turbines.[8]

Design activities will be carried out by Su-Yapi Engineering and Consulting Inc.

Construction is to be carried out by a Limak Holding-Cengiz Holding-Kolin consortium.[1]

Projected biological impacts

If built, Yusufeli Dam is expected to have significant biological impacts including:

Nationally rare plants threatened by the Yusufeli Dam
SpeciesEndemicThreat levelDistribution in Turkey
Reseda globosaNoCritically endangeredCoruh Valley
Lathyrus woronowiiEndemicCritically endangeredCoruh Valley
Ferula merviniiEndemicCritically endangeredYusufeli & its vicinity
Anthemis calcarea var calcareaEndemicCritically endangeredArtvin-Erzurum
Anthemis calcarea var discoideaEndemicCritically endangeredArtvin-Erzurum
Centaurea straminicephalaEndemicCritically endangeredCoruh Valley
Centaurea leptophyllaEndemicCritically endangeredYusufeli & its vicinity
Clypeola raddeanaEndemicEndangeredCoruh Valley
Morina persica var decussatifoliaEndemicEndangeredArtvin-Erzurum
Campanula troegeraeƒEndemicEndangeredArtvin-Erzurum
Verbascum gracilescensEndemicEndangeredCoruh Valley
Asperula virgataEndemicEndangeredCoruh Valley
Acer divergens var divergensEndemicVulnerableCoruh Valley
Sempervivum staintoniiEndemicVulnerableCoruh Valley
Seseli andronakiiEndemicVulnerableArtvin-Erzurum
Bupleurum brachiatumEndemicVulnerableMiddle & East Blacksea
Bupleurum schistosumEndemicVulnerableCoruh Valley
Centaurea pechoEndemicVulnerableEast Blacksea
Centaurea hedgeiEndemicVulnerableArtvin-Erzurum
Linaria genistifolia subsp artivinensisEndemicVulnerableCoruh Valley
Iris taochiaEndemicVulnerableEast Blacksea