Vista Canyon Multi-Modal Center

Vista Canyon Multi-Modal Center, also known as the Vista Canyon Regional Transit Center, is a Metrolink commuter rail station and transport hub in the Canyon Country neighborhood of Santa Clarita, California. It is located along Metrolink's Antelope Valley Line.

Vista Canyon
Vista Canyon station platform
General information
Location2755012 Vista Canyon Boulevard
Santa Clarita, California
Coordinates34°24′47″N 118°26′02″W / 34.4131°N 118.4339°W / 34.4131; -118.4339 (Vista Canyon station)
Owned byCity of Santa Clarita[1]
Line(s)SCRRA Valley Subdivision[2]
Platforms1 island platform[3][4]
Tracks2
Bus stands8
Construction
Structure typeEmbankment
ParkingYes
Bicycle facilitiesRacks and 18 lockers[5][6]
AccessibleYes
History
OpenedOctober 23, 2023; 8 months ago (2023-10-23)[7]
Services
Preceding station MetrolinkFollowing station
Vincent Grade/Acton
toward Lancaster
Antelope Valley LineVia Princessa
Location
Map

The station, which opened as infill between the previously existing Vincent Grade/Acton and Via Princessa stations, officially opened on October 23, 2023, following a ribbon-cutting ceremony held on October 20, 2023.[7] An adjacent surface parking lot with 120 parking spaces opened in March 2024.

Vista Canyon Multi-Modal Center is served by 22 Metrolink Antelope Valley Line trains (11 in each direction) each weekday. Weekend service consists of 12 trains (6 in each direction) on both Saturday and Sunday. On all days, trains are evenly spaced throughout the day.[8]

Overview

Built as part of the adjacent Canyon Valley transit-oriented development, the development features a Metrolink commuter rail infill station along the Antelope Valley Line, a bus transfer facility, and a 613-space parking garage.[9] The hub is partly funded by a special tax district of adjacent properties,[10] and by grants from Caltrans. The contract awarded for construction of the train station was valued at $23.7 million.[4] City of Santa Clarita Transit is aiming to begin serving the facility in late 2023.[11]

History

Initial planning for the transit center began in April 2010 and was completed in November 2012. NEPA environmental approval was obtained in June 2014. Pre-construction of the transit center began in September 2016, with construction expected to begin in November.[12]

On October 22, 2019, the Santa Clarita City Council unanimously approved a $1 million construction management contract with RailPros to build out the Metrolink station at Vista Canyon.[13]

Construction of the train station led by Icon West, Inc. began in December 2020.[14] A groundbreaking for the rail station was held the same day as the opening of the parking facility: October 27, 2020.[9] At that time, the station was expected to open in 2022.[15]

See also

References

Media related to Vista Canyon Regional Transit Center at Wikimedia Commons


🔥 Top keywords: Main PageSpecial:SearchPage 3Wikipedia:Featured picturesHouse of the DragonUEFA Euro 2024Bryson DeChambeauJuneteenthInside Out 2Eid al-AdhaCleopatraDeaths in 2024Merrily We Roll Along (musical)Jonathan GroffJude Bellingham.xxx77th Tony AwardsBridgertonGary PlauchéKylian MbappéDaniel RadcliffeUEFA European Championship2024 ICC Men's T20 World CupUnit 731The Boys (TV series)Rory McIlroyN'Golo KantéUEFA Euro 2020YouTubeRomelu LukakuOpinion polling for the 2024 United Kingdom general electionThe Boys season 4Romania national football teamNicola CoughlanStereophonic (play)Gene WilderErin DarkeAntoine GriezmannProject 2025