Toh Guan MRT station

Toh Guan MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line (JRL) in Jurong East, Singapore.[1][2][3] Announced on 9 May 2018, it will be constructed as part of Phase 2 of the JRL.

 JE4 
Toh Guan
卓源
டோ குவான்
Future Mass Rapid Transit (MRT) station
Toh Guan MRT station site
General information
Coordinates1°20′23″N 103°44′33″E / 1.33984°N 103.7425°E / 1.33984; 103.7425
Owned byLand Transport Authority
Line(s)
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeElevated
Platform levels1
ParkingYes
Bicycle facilitiesYes
AccessibleYes
History
Opening2028; 4 years' time (2028)
ElectrifiedYes
Services
Preceding stationMass Rapid TransitFollowing station
Bukit Batok West
towards Tengah
Jurong Region Line
Future service
Jurong East
Location
Singapore MRT/LRT system map
Singapore MRT/LRT system map
Toh Guan
Toh Guan station in Singapore

The station is located in the Jurong East planning area at the junction of Toh Guan Road and Jurong East Avenue 1 to the north.

History

On 9 May 2018, LTA announced that Toh Guan station would be part of the proposed Jurong Region line (JRL). The station will be constructed as part of Phase 2, JRL (East), consisting of 7 stations between Tengah and Pandan Reservoir, and is expected to be completed in 2028.[4]

Contract J109 for the design and construction of Toh Guan Station and associated viaducts was awarded to Daewoo Engineering & Construction Co. Pte Ltd - Yongnam Engineering and Construction Pte Ltd Joint Venture at a sum of S$320.4 million in July 2020. Construction is expected to start in 2020. Contract J109 also includes the design and construction of the Jurong Town Hall and Pandan Reservoir stations and the 3.6-kilometre (2.2 mi) associated viaducts.[5][6][7][8]

Initially expected to open in 2027, the restrictions on the construction due to the COVID-19 pandemic has led to delays in the JRL line completion, and the date was pushed to 2028.[9]

Location

The station complex will be straddled over the existing Jurong East Central, with the junction with Toh Guan Road and Jurong East Avenue 1 to the north, and the junction with Jurong East Street 21 to the south. It is located in the Jurong East planning area between the Yuhua East and Toh Guan Subzones,[10] parallel to the North South line approach tracks to Jurong East station, nested within housing estates.

Access to the station will be via 2 exits on each side of Jurong East Central.[11]