San'yō Main Line

(Redirected from Sanyo Main Line)

The San'yō Main Line (山陽本線, San'yō-honsen) is a major railway line owned by JR Group companies in western Japan, connecting Kōbe Station and Moji Station, largely paralleling the coast of the Seto Inland Sea, in other words, the southern coast of western Honshu. The San'yō Shinkansen line largely parallels its route. The name Sanyō derived from the ancient region and highway San'yōdō, the road on the sunny (south) side of the mountains.

San'yō Main Line
JNR 115-3000 in Setouchi yellow livery run near the Seto Inland Sea.
Overview
Other name(s)JR Kobe Line (Kobe – Himeji)
Native name山陽本線
Owner
LocaleKansai, Chugoku, Kyushu regions
Termini
Stations124
Service
TypeHeavy rail, commuter rail
System
  • Urban Network
    (Kōbe – Kamigōri, Hyōgo – Wadamisaki)
  • Hiroshima City Network
    (Shiraichi – Minami-Iwakuni)
Operator(s)
History
Opened1872
Technical
Line length
  • 528.1 km (328.1 mi)
    (Kōbe – Shimonoseki)
  • 6.3 km (3.9 mi)
    (Shimonoseki – Moji)
  • 2.7 km (1.7 mi)
    (Hyōgo – Wadamisaki)
Track gauge1,067 mm (3 ft 6 in)
Electrification
Operating speed
  • 130 km/h (81 mph)
    (Kōbe – Okayama)
  • 120 km/h (75 mph)
    (Okayama – Shimonoseki)
  • 85 km/h (53 mph)
    (Shimonoseki – Moji, Hyōgo – Wadamisaki)

The Sanyō Main Line is operated by two JR companies:

The Wadamisaki Line, a short section of line in the length of 2.7 km (1.7 mi) between Hyōgo and Wadamisaki stations in Kobe is a branch of the Sanyō Main Line. A short section connecting Kitakyushu Freight Terminal also forms part of the Sanyō Main Line.

Basic data

  • Operators, distances: 537.1 km (333.7 mi).
  • Gauge: 1,067 mm (3 ft 6 in)
  • Stations:
    • Passenger stations: 124
    • Freight terminals: 5
  • Track:
    • Quadruple-track line:
      • From Kobe to Nishi-Akashi: 22.8 km (14.2 mi).
      • From Kaitaichi to Hiroshima: 6.4 km (4.0 mi).
    • Double-track line:
      • From Nishi-Akashi to Kaitaichi: 275.5 km (171.2 mi).
      • From Hiroshima to Moji: 208.0 km (129.2 mi).
    • Single-track line:
      • From Hyōgo to Wadamisaki
  • Electrification: Entire line (1,500 V DC. Excluding inside Moji Station and Kitakyūshū Freight Terminal, which is 20,000 V AC, 60 Hz.)
  • Railway signalling:
    • From Kobe to Moji: Automatic
    • From Hyōgo to Wadamisaki: Special Automatic (Track Circuit Detection [ja]); a simplified automatic system.
  • Maximum speed at service:
    • From Kobe to Himeji: 130 km/h (81 mph)
    • From Himeji to Okayama: Tilting trains 130 km/h (81 mph), others 120 km/h (75 mph)
    • From Okayama to Shimonoseki: 120 km/h (75 mph)
    • From Shimonoseki to Moji: 85 km/h (53 mph)
    • From Hyōgo to Wadamisaki: 85 km/h (53 mph)
  • CTC centers:
    • From Kobe to Kamigōri: Shin-Ōsaka Operation Control Center
    • From Kamigōri to Itozaki: Okayama Transportation Control Room
    • From Itozaki to Shimonoseki: Hiroshima Operation Control Center
    • From Shimonoseki to Moji: Hakata Operation Control Center
  • CTC system:
    • From Kobe to Kamigōri: Safety Urban Network Traffic System (SUNTRAS [ja])

Stations

From Kobe to Himeji (JR Kobe Line)

●: Trains stop at all times
|: Trains pass at all times
▲: Eastbound trains pass in the morning
○: Weekday mornings only

Official line nameNo.StationJapaneseDistance (km)StopTransfersLocation
Between stationsfrom OsakaLocalRapidSpecial RapidWard, CityPrefecture
Through service to/from the JR Kyoto Line
Tokaido Main Line A63 Kobe神戸1.733.1Chuo-ku, KobeHyōgo
San'yō Main Line
 A64 Hyōgo兵庫1.834.9|     Wadamisaki Line (San'yō Main Line)Hyogo-ku, Kobe
 A65 Shin-Nagata新長田2.337.2||
  • Kobe Municipal Subway:
  • Seishin-Yamate Line (S09)
  • Kaigan Line (K10)
Nagata-ku, Kobe
 A66 Takatori鷹取1.038.2||Suma-ku, Kobe
 A67 Suma-Kaihinkōen須磨海浜公園0.939.1||
 A68 Suma須磨1.340.4| Sanyo Railway Main Line (SY 06: Sanyo Suma Station)
 A69 Shioya塩屋2.043.3|| Sanyo Railway Main Line (SY 08: Sanyo Shioya Station)Tarumi-ku, Kobe
 A70 Tarumi垂水2.946.2| Sanyo Railway Main Line (SY 11: Sanyo Tarumi Station)
 A71 Maiko舞子2.048.2| Sanyo Railway Main Line (SY 13: Maiko-koen Station)
 A72 Asagiri朝霧1.950.1||Akashi
 A73 Akashi明石2.452.5 Sanyo Railway Main Line (SY 17: Sanyo Akashi Station)
 A74 Nishi-Akashi西明石3.455.9 San'yō Shinkansen
 A75 Okubo大久保2.858.7|
 A76 Uozumi魚住3.562.2|
 A77 Tsuchiyama土山3.165.3|Harima
 A78 Higashi-Kakogawa東加古川3.368.6|Kakogawa
 A79 Kakogawa加古川3.672.2I Kakogawa Line
 A80 Hoden宝殿3.375.5|Takasago
 A81 Sone曽根4.079.5|
 A82 Himeji Besshoひめじ別所2.081.5|Himeji
 A83 Gochaku御着2.183.6|
 A84 Higashi-Himeji東姫路2.486.0|
 A85 Himeji姫路1.987.9
Through service to/from the San'yō Main Line (below)

From Himeji to Itozaki

  • All trains except Limited Express trains stop at all stations in this section.[1]
  • Rapid trains coming from Osaka/Kobe area become local trains after Akashi and Special Rapid trains stop at all stations west of Himeji, operating up to Kamigōri or through to the Akō Line.
No.Station nameJapaneseTotal distance (km)TransfersLocation
JR West
Himeji姫路54.8
HimejiHyōgo
Agaho英賀保59.4
Harima-Katsuharaはりま勝原62.2
Aboshi網干65.1
Tatsuno竜野71Tatsuno
Aioi相生75.5 San'yō Shinkansen
A Akō Line
Aioi
Une有年83.1Akō
Kamigōri上郡89.6Chizu Express Chizu LineKamigōri, Akō
 S11 Mitsuishi三石102.4BizenOkayama
 S10 Yoshinaga吉永109.5
 S09 Wake和気114.8Wake, Wake
 S08 Kumayama熊山119.4Akaiwa
 S07 Mantomi万富123.5Higashi-ku, Okayama
 S06 Seto瀬戸128.0
 S05 Jōtō上道132.7
 S04 Higashi-Okayama東岡山136.1N Akō LineNaka-ku, Okayama
 S03 Takashima高島138.9
 S02 Nishigawara西川原140.8
 S01 
 W01 
Okayama岡山143.4
  • San'yō Shinkansen
  • L Uno Line (M Seto-Ōhashi Line)
  • T Tsuyama Line
  • U Kibi Line (Momotarō Line)
  • Okayama Electric Tramway (both at Okayama-Ekimae):
    1.   Higashiyama Line
    2.   Seikibashi Line
Kita-ku, Okayama
Nishi-Okayama Freight Terminal西岡山(貨)145.9
 W02 Kitanagase北長瀬146.8
 W03 Niwase庭瀬149.9
 W04 Nakashō中庄154.6Kurashiki
 W05 Kurashiki倉敷159.3V Hakubi Line
Mizushima Main Line (Kurashikishi)
 W06 Nishiachi西阿知163.3
 W07 Shin-Kurashiki新倉敷168.6 San'yō Shinkansen
 W08 Konkō金光174.9Asakuchi
 W09 Kamogata鴨方178.4
 W10 Satoshō里庄182.4Satoshō, Asakuchi
 W11 Kasaoka笠岡187.1Kasaoka
 W12 Daimon大門194.2FukuyamaHiroshima
 W13 Higashi-Fukuyama東福山197.5
 W14 
 X14 
Fukuyama福山201.7 San'yō Shinkansen
Z Fukuen Line
 X15 Bingo-Akasaka備後赤坂207.5
 X16 Matsunaga松永212.4
 X17 Higashi-Onomichi東尾道215.3Onomichi
 X18 Onomichi尾道221.8
 X19 
 G17 
Itozaki糸崎230.9Mihara

From Itozaki to Tokuyama (Hiroshima City Network)

A: Akiji liner rapid service (through to the Kure Line)
C: City liner rapid service (limited weekend service only)

●: All trains stop
|: Trains pass at all times
○: All trains stop, limited service

No.Station nameJapaneseTotal distance (km)ACTransfersLocation
JR West
 X19 
 G17 
Itozaki糸崎230.9MiharaHiroshima
 X20 
 G16 
Mihara三原233.3 San'yō Shinkansen
Y Kure Line
 G15 Hongō本郷242.8
 G14 Kōchi河内255.1Higashihiroshima
 G13 Nyūno入野259.5
 G12 Shiraichi白市263.9
 G11 Nishitakaya西高屋268.3
 G10 Saijō西条272.9
 G09 Jike寺家275.2
 G08 Hachihommatsu八本松278.9
 G07 Seno瀬野289.5Aki-ku, Hiroshima
 G06 Nakanohigashi中野東292.4
 G05 Aki-Nakano安芸中野294.4
 G04 Kaitaichi海田市298.3Y Kure LineKaita, Aki
 G03 Mukainada向洋300.6Fuchū, Aki
 G02 Tenjingawa天神川302.4Minami-ku, Hiroshima
Hiroshima Freight Terminal広島貨物ターミナル303.1
 G01 
 R01 
Hiroshima広島304.7
 R02 Shin-Hakushima新白島306.5B Kabe Line
Astram Line (Hiroshima Rapid Transit)
Nishi-ku, Hiroshima
 R03 Yokogawa横川307.7B Kabe Line
  Hiroden Streetcar Route 7
  Hiroden Streetcar Route 8
Hiroden Yokogawa Line
 R04 Nishi-Hiroshima西広島310.2  Route 2
  Route 3
Main Line and Hiroden Miyajima Line (Hiroden-nishi-hiroshima)
 R05 Shin-Inokuchi新井口314.4  Route 2
Hiroden Miyajima Line (Shoko Center-iriguchi)
 R06 Itsukaichi五日市316.8  Route 2
Miyajima Line (Hiroden-itsukaichi)
Saeki-ku, Hiroshima
 R07 Hatsukaichi廿日市320.2  Route 2
Miyajima Line (Hiroden-hatsukaichi)
Hatsukaichi
 R08 Miyauchi-Kushido宮内串戸321.8  Route 2
Miyajima Line (Miyauchi)
 R09 Ajina阿品324.8  Route 2
Miyajima Line (Hiroden-ajina)
 R10 Miyajimaguchi宮島口326.5  Route 2
Miyajima Line (Hiroden-miyajima-guchi)
JR Miyajima Ferry
 R11 Maezora前空328.3
 R12 Ōnoura大野浦331.4
 R13 Kuba玖波336.4Ōtake
 R14 Ōtake大竹340.8
 R15 Waki和木342.3Waki, KugaYamaguchi
 R16 Iwakuni岩国346.1     Gantoku LineIwakuni
Minami-Iwakuni南岩国350.7
Fujū藤生353.4
Tsuzu通津358.6
由宇361.6
Kōjiro神代366.8
Ōbatake大畠371.9Yanai
Yanaiminato柳井港376.4
Yanai柳井379.2
Tabuse田布施385.4Tabuse, Kumage
Iwata岩田390.9Hikari
Shimata島田395.9
Hikari400.7
Kudamatsu下松406.9Kudamatsu
Kushigahama櫛ヶ浜411.5     Gantoku LineShūnan
Tokuyama徳山414.9 San'yō Shinkansen

Tokuyama to Moji

  • All trains stop at all stations in this section
Station nameJapaneseTotal distance (km)TransfersLocation
JR West
Tokuyama徳山414.9 San'yō ShinkansenShūnanYamaguchi
Shinnan-yō新南陽421.9
Fukugawa福川425.7
Heta戸田425.7
Tonomi富海434.2Hōfu
Hōfu Freight Terminal防府(貨)437.2
Hōfu防府441.4
Daidō大道449.2
Yotsutsuji四辻454.0Yamaguchi
Shin-Yamaguchi新山口459.2
Kagawa嘉川463.2
Hon-Yura本由良467.7
Kotō厚東478.0Ube
Ube宇部484.5     Ube Line
Onoda小野田488.0     Onoda LineSanyōonoda
Asa厚狭494.3 San'yō Shinkansen
     Mine Line
Habu埴生502.6
Ozuki小月508.8Shimonoseki
Chōfu長府515.0
Shin-Shimonoseki新下関520.9 San'yō Shinkansen
Hatabu幡生524.6     San'in Main Line
Shimonoseki下関528.1
JR Kyushu
Shimonoseki下関ShimonosekiYamaguchi
Moji門司534.4JA Kagoshima Main LineMoji-ku, KitakyushuFukuoka

Rolling stock

JR West 113 series EMU
JR West 223 series EMU
Freight train with Class EF210 locomotive

JR West

Limited Express

Local trains

JR Kyushu

History

The entire line between Kobe Station and Shimonoseki Station was originally opened by the private Sanyō Railway company. The section between Hyōgo Station (in Kobe) and Akashi Station (in Akashi, Hyōgo) opened first in 1888. In 1889 the line was extended to the east to Kobe Station (as a dual track section) and Tatsuno Station (in Tatsuno, Hyōgo Prefecture) to the west. The Sanyō Railway was progressively extended to the west, reaching Okayama and then Fukuyama in 1891, Hiroshima in 1894 and in 1901 it reached Bakan (now Shimonoseki) Station. Under the Railway Nationalization Act of 1906 it was purchased by the Japanese government and renamed Sanyō Main Line.

Duplication

The Hyogo – Himeji section was duplicated in 1899, and the Hiroshima – Kaitaichi section in 1903. After the line was nationalised, further duplications occurred between Kamigori – Yoshinaga in 1910/11, Hatabu – Shimonoseki in 1915 and Himeji – Agaho in 1917. Work to duplicate the remainder of the line commenced in 1921, and opened in stages until completed in 1930, with the exception of the section between Iwakuni and Kushigahama, where construction of a new direct line had commenced. This direct line, which bypassed the coastal section via Yanai involved significant tunnelling, and unexpected geological instability delayed completion of the line until 1934, and then as a single track. Although the new line became the Sanyo Main Line at that time, in 1944 the original coastal alignment was duplicated and returned to the formal Sanyo Main Line, with the former bypass line becoming the Gantoku Line.

Electrification

The Kobe – Akashi section was electrified in 1934, extended to Himeji in 1958, Hiroshima in 1962 and (except for the Wadamisaki Line, which was electrified in 2001) the entire line was electrified in 1964, to coincide with the opening of the Tōkaidō Shinkansen between Tokyo and Shin-Osaka the same year.

Deviation/extension

The Sanyō Main Line approximately parallels the Inland Sea but some sections could be shortened by tunnels. In 1934, the Gantoku Line between Iwakuni and Tokuyama was opened and replaced the former line which traverses Yanai adjacent to the Inland Sea. In 1944, this new alignment was replaced again by the previous coastal alignment because the coastal line was upgraded to dual tracks.

The Sanyō Main Line was connected to Kyushu by ferry from Shimonoseki and Shimonosekiko Station (Port Shimonoseki). In 1942, the Kanmon Tunnel under the Kanmon Straits was completed and the Sanyō Main Line was extended to Moji Station. A second tunnel duplicating the section opened in 1944.

Service variations

Prior to the opening of the San'yō Shinkansen, many expresses operated on the Sanyō Main Line as it served as a major transport corridor through Western Honshu and connecting to Kyushu. The Shinkansen was extended as the San'yō Shinkansen line, first to Okayama Station in 1972, and then to Hakata Station in 1975. On both occasions, many express services on the Sanyo Main Line were withdrawn, and since 1972, the line has been mainly used by local and freight services. CTC signalling was commissioned between Mihara and Shimonoseki in 1984.

Service disruptions

The section between Kobe and Nishi Akashi was severely damaged by the 1995 Great Hanshin earthquake, and took ten weeks to repair.

The 2018 Japan floods resulted in the Okayama – Shimonoseki section closing on 6 July 2018.[2] The majority of services were restored between 8 July – 18 July of that year, but the Yanai – Tokuyama section remained out of service until 9 September of that year.[3]

Former connecting lines

Iwakuni Electric Railway train
A Nagato Railway train
  • Hyogo station – A 5 km lne to the Hyogo Port operated between 1911 and 1984.
  • Tsuchiyama station – A 4 km line to Befu-Ko operated between 1923 and 1984. It is connected to the Sanyo Electric Railway Main Line at Befu.
  • Kakogawa station – The Banshu Railway Co. opened an 8 km (5.0 mi) line to Takasago-Minato in 1913/1914. The line was nationalised in 1943, and closed in 1984.
  • Himeji station – The Bantan Railway Co. built a 16 km (9.9 mi) line east to Shikama-Kou (near Kakogawa), opened in 1895 and closed in 1986.
  • Aboshi station –

The Tatsuno Electric Railway Co. opened a 17 km (11 mi) 1,435 mm (4 ft 8+12 in) gauge line electrified at 600 VDC from Shingu-Cho to Aboshiko between 1909 and 1915 which connected at this station. The line closed in 1934.

A 6 km line to Hamadako operated between 1943 and 1989.

  • Une station – The Ako Railway operated a 13 km (8.1 mi) 762 mm (2 ft 6 in) gauge line to Banshu-Ako on the Ako Line between 1921 and 1951.
  • Wake station – The Dowa Mining Co. opened a 34 km (21 mi) line between Nishi-Katakamito on the Ako Line and Yanahara, to haul iron sulphide ore, between 1923 and 1931. Passenger services commenced in 1931, freight services ceased in 1988 and the line closed in 1991.
  • Takashima station – The Saidaiji Railway Company operated a 915 mm (3 ft) gauge line between its namesake town and Korakuen between 1911 and 1962.
  • Kasaoka station – The Ikasa Railway Co. operated a 19 km (12 mi) 762 mm (2 ft 6 in) gauge line to Ihara between 1913 and 1971. It had a 6 km branch from Kitagawa to Yakage that operated between 1921 and 1967. At Ihara it connected to the company's line to Kannabe on the Fukuen Line.
  • Fukuyama station – The Tomo Light Railway Co. operated a 13 km (8.1 mi) 762 mm (2 ft 6 in) gauge line to its namesake town between 1913/1914 and 1954.
  • Onomichi station – The Hiroshima Prefectural Government opened a 17 km (11 mi) line electrified at 600 V DC to Shoharachi in 1925/1926. It closed between 1957 and 1964.
  • Seno Station – The 1.3 km (0.81 mi) Skyrail Midorizaka Line monorail connected Midori-Chūō Station with Seno (Skyrail's Midoriguchi Station) from 1998 to 2024.
  • Hiroshima station – The Sanyo Railway Co. was commissioned by the Japanese Army to build a 6 km (3.7 mi) line to Ujina Port following the outbreak of the First Sino-Japanese War in 1894. In 1897 the company leased the line from the Army and commenced a passenger service, and when the company was nationalised in 1906, ownership of the line transferred from the Army to JGR. The Army leased the line in 1915 for use during WW1 and subsequent hostilities in China, and passenger services were suspended between 1919 and 1930. The line was not damaged by the atomic bomb attack, but was damaged by Typhoon Marurazaki which hit the area 6 weeks later. Passenger service ceased in 1972, and the line closed in 1986.

The Kirin Brewery operated a 2 km (1.2 mi) line to its complex between 1937 and 1986.

  • Iwakuni station – The Iwakuni Electric Railway Co. opened a 6 km line to Shinmachi, electrified at 600 V DC, between 1909 and 1912. The line closed in 1929 when the parallel Gantoku Line opened.
  • Hofu station – A 19 km (12 mi) line to Hori operated 1919/1920 to 1964.
  • Shin-Yamaguchi station – The Dainippon Railway Co. opened a 13 km (8.1 mi) line from Ogori (as Shin-Yamaguchi was called until 2003) to Yamaguchi in 1908, which closed in 1913 -when the JGR opened its parallel line.
  • Ube station – The Funaki Railway Co. opened a 6 km (3.7 mi) 762 mm (2 ft 6 in) gauge line in 1916. The line was converted to 1067mm gauge in 1922, and extended 12 km (7.5 mi) to Kibe in 1926. The last 8 km (5.0 mi) closed in 1944, and the rest of the line in 1961.
  • Ozuki station – The Nagato Railway Co. opened an 18 km (11 mi) line to Nishi-Cho in 1918. JGR assumed control of the line as a wartime measure in 1942, a situation that continued until 1949. The line closed in 1956.
  • Hatabu station – The Choshu Railway opened a 27 km (17 mi) line from Higashi-Shimonoseki to Kogushi via Hatabu in 1914. A proposed extension to Nagato was not built due to funding constraints. The part from Hatabu to Kogushi was nationalised in 1925, with the Hatabu station being moved to its present location in 1928, and the line becoming a part of the San'in Main Line in 1933. The remaining 2.2 km (1.4 mi) Choshu Railway line from Hatabu to Higashi-Shimonoseki was electrified at 600 V DC in 1926. The company merged with the Sanyo Electric Railway (today Sanden Kotsu, not to be confused with the eponymous company operating in the Hyōgo Prefecture) in 1928, and the line was extended to Karato in 1932 in order to connect it to the Sanyo Electric Chōfu to Hikoshima-Guchi line. The line was closed in 1971.

See also

References