Line 27 (Shenzhen Metro)

Line 27 of the Shenzhen Metro is a line under construction, which will connect the districts of Nanshan, Longhua and Longgang.[1] Construction began on 25 April 2024. The first phase of Line 27 will run from Songpingcun in Nanshan District near Xili High Speed Railway Station to Gangtou West in Longgang District, and from Jihua Hospital to Lizhi Orchard in Longgang District, with 21 stations and 25.6 kilometers of track.[2] The line is proposed to use 6 car type B trains.[3]

Line 27
27
Overview
StatusUnder construction
LocaleShenzhen, Guangdong
Termini
  • Songpingcun, Jihua Hospital (Phase 1)
    Future: Qianwan Park West
  • Gangtou West, Lizhi Orchard (Phase 1)
    Future: Yangmei
Stations21 (Phase 1)
Service
TypeRapid transit
SystemShenzhen Metro
Services2
Operator(s)SZMC (Shenzhen Metro Group)
Technical
Line length25.6km (Phase 1)
CharacterUnderground
Operating speed80km/h
Line 27 full alignment (in Chinese)

Stations (Phase 1)

Station nameConnectionsLocation
EnglishChinese
Songpingcun松坪村Nanshan
Xili High Speed Railway Station西丽高铁站 13   15   29 
ELQ
Xili South西丽南
Xili西丽5 7
Lishan丽山
Lishui丽水
Xuefu Hospital学府医院 7 
Nanshan Zhiyuan南山智园
Changlingpi长岭陂5
Shenzhen North Station West Square北站西广场4 5 6 (via Shenzhen North)
 XS   GSH  IOQ
Longhua
Minfeng Road民丰路
Baishilong白石龙4
Zhangkeng樟坑
Minbao民宝
Huacheng华城
Yinquan银泉
Youfu油福 25 
Songhe松和 22 
Gangtou West岗头西Longgang
Jihua Hospital吉华医院 25 Longgang
Lizhi Orchard荔枝苑

References