KTM ETS

(Redirected from ETS Line)


The KTM ETS, commercially known as ETS (Electric Train Service), is an inter-city higher-speed rail in Malaysia operated by Keretapi Tanah Melayu (KTM). The KTM ETS is the second electric train service to be operated by the Malaysian railway company after KTM Komuter, and the second inter-city rail service after KTM Intercity.

KTM ETS
KTM Electric Train Service
A KTM Class 93 (Platinum service) arriving in Kampar
A KTM Class 93 (Platinum service) arriving in Kampar
Overview
Native namePerkhidmatan Tren Elektrik (Malay)
电动列车服务 (Chinese)
மின்சார ரயில் சேவை (Tamil)
OwnerKeretapi Tanah Melayu Berhad (KTMB)
LocalePadang Besar - Butterworth - Ipoh - Kuala Lumpur - Gemas - (Johor Bahru mid-2025)
Stations36 (as of 15 January 2022)[1]
Websitewww.ktmb.com.my
Service
TypeInter-city rail - Higher-speed rail
Operator(s)KTM Intercity Division
Rolling stock5 six-car trainset of KTM Class 91
19 six-car trainset of KTM Class 93
Daily ridership10,489 (Third quarter 2018)[2]
Ridership3.902 million (2019) [3]
History
Opened12 August 2010; 13 years ago (2010-08-12)
Technical
Line lengthCurrent:
755 km (469 mi) (Padang Besar-Gemas)
Under construction:
192 km (119 mi) (Gemas-Johor Bahru Sentral)
Track gauge1,000 mm (3 ft 3+38 in) metre gauge
Electrification25 kV 50 Hz AC catenary
Conduction systemWith driver
Operating speed145 to 160 km/h (90 to 99 mph)
Route map

Hat Yai Junction
Khlong Ngae
Padang Besar (Thai)
Thailand
Malaysia
international
border
Padang Besar
International Express  2 
Arau
 2 
Perlis
Kedah
state
border
Kedah River Bridge
Anak Bukit
Sultan Abdul Halim Airport
 2 
Alor Setar
 2 
Gurun
 2 
Sungai Petani
 2 
Sungai Muda bridge
Kedah
Penang
state
border
Tasek Gelugor
 2 
Butterworth Penang ferry service
 2 
Bukit Mertajam
 1   2 
Bukit Mertajam junction
North-South Expressway
Nibong Tebal
 1 
Kerian River bridge
Penang
Perak
state
border
Parit Buntar
 1 
Bagan Serai
 1 
North-South Expressway
Bukit Merah Lake Railway Bridge
Kamunting
 1 
Taiping
 1 
Padang Rengas
 1 
Kuala Kangsar
 1 
Perak River bridge
(Formerly Victoria Bridge)
Sungai Siput
 1 
Ipoh
Sultan Azlan Shah Airport
 1 
Batu Gajah
Kampar
Tapah Road
Sungkai
Slim River
Behrang
Tanjung Malim
Sungai Bernam bridge
Perak
Selangor
state
border
Kuala Kubu Bharu
Batang Kali
Rawang
Sungai Buloh
Kepong Sentral
Kuala Lumpur
1 2 5 9
Kuala Lumpur Sentral
1 2 5 6 7 8 9 10
Bandar Tasik Selatan
1 4 7
Kajang
Seremban
Negeri Sembilan
Malacca
state
border
Pulau Sebang/Tampin
Batang Melaka
Gemas
KTM Intercity
extension by 2025
 
Gemas River bridge
Negeri Sembilan
Johor
state
border
Sungai Muar bridge
Segamat
KTM Intercity
Genuang
Tenang
Labis
KTM Intercity
Bekok
KTM Intercity
Paloh
KTM Intercity
Chamek
KTM Intercity
Kluang
KTM Intercity
Mengkibol
Renggam
KTM Intercity
Layang-Layang
KTM Intercity
Kulai
KTM Intercity
Kempas Bahru
KTM Intercity
Johor Bahru Sentral
  RTS   BRT  KTM Intercity
Malaysia
Singapore
international
border

Having begun operations in 2010, the ETS is the fastest metre-gauge train service in Malaysia and operates along the historical KTM West Coast Line in western Peninsular Malaysia which has since been electrified and double-tracked, from the north at Padang Besar, close to the border with Thailand, and towards Gemas, at Negeri Sembilan. A southern extension from Gemas to Johor Bahru Sentral, close to the border with Singapore, is expected to begin operations in 2025, completing the rail electrification between the northern and southern borders.

The rail service is currently operated by the KTM Intercity. It was previously operated by ETS Sendirian Berhad, a fully owned subsidiary of Keretapi Tanah Melayu Berhad.

Train services

Former route map of ETS services. Services have since changed to include a new service category and a reshuffle of stations served along the West Coast Line.

Routes

Odd-numbered train numbers denote southbound trains (trains bound for KL Sentral and Gemas). Even-numbered train numbers denote northbound trains (trains bound for Padang Besar, Butterworth and Ipoh).[4]

Train numberRouteServiceStopsTrain tripsClass
EG9022, EG9025, EG9027, EG9028,

EG9032, EG9035,

KL SentralIpohGold12391 & 93/1
ES9051, ES9052Silver141
EX9004, EX9009Express4193/2
EP9272, EP9273, EP9274, EP9275, EP9278, EP9279KL SentralPadang BesarPlatinum153
EX9206, EX9207Express91
EP9171, EP9172, EP9173, EP9176, EP9177, EP9178, EP9179, EP9180KL SentralButterworthPlatinum124
EX9104, EX9107Express61
EG9420, EG9425Padang BesarGemasGold29193/1
EG9321, EG9322ButterworthGemasGold241

The ETS covers the section of the West Coast Main Line between Padang Besar near the Malaysia-Thailand border and Gemas near the border between Negeri Sembilan and Johor, including the branch line between the Bukit Mertajam Junction and Butterworth. The line from Gemas to Johor Bahru is currently a single track and is being double tracked and electrified. Most routes originate from KL Sentral, the main railway station of Kuala Lumpur, the capital city of Malaysia

The ETS operates 5 routes, namely:

Currently, there are 5 return trips on the KL Sentral - Ipoh route, 5 return trips on the KL Sentral - Butterworth route, 4 return trips on the KL Sentral - Padang Besar route and 1 return trip each on the Gemas - Padang Besar and Gemas - Butterworth routes daily. As of 2020, due to travelling restrictions and efforts to curb the pandemic, there were only 2 trips per day along the 5 routes that are currently under operation, while as of 2022 all services have been resumed with lesser Gold service trains.

On 1st August 2024, KTM will begin ETS Express services, 3 new limited-stop, express train services between the KL Sentral - Ipoh, KL Sentral - Butterworth and KL Sentral - Padang Besar routes, replacing former ETS Gold services on these routes. These new services offer faster travels, with trains only stopping at major stations along the West Coast Line. These new services comes after the completion of Phase 1 of the Klang Valley Double Track and Electrification (KDVT) Project.[5][6]

Services

The train services are operated in 4 categories:

  • Express service with fewer limited stops (3 return trips), along with business class coach service
  • Platinum service with limited stops (7 return trips), along with business class coach service
  • Gold service with selected stops (5 return trips)
  • Silver service with stops at all stations. (1 return trip)

List of Stations

⇄ = cross-platform interchange

CodeNameImageParking baysInterchange/notes
PDRPadang Besar Available

Northern terminus. Railway service continue to Hat Yai Junction via SRT. Linkbridge access to the Padang Besar Immigration, Customs, Quarantine and Security (ICQS) Complex.

Northern terminus of the KTM Komuter Northern Sector's Padang Besar-Butterworth Line.

Padang Besar-Butterworth Line

ARUArau AvailablePadang Besar-Butterworth Line
ABTAnak Bukit AvailablePadang Besar-Butterworth Line
ALSAlor Setar AvailablePadang Besar-Butterworth Line
GRNGurun AvailablePadang Besar-Butterworth Line
SPTSungai Petani AvailablePadang Besar-Butterworth Line
TGLTasek GelugorAvailablePadang Besar-Butterworth Line
NTBNibong TebalAvailableButterworth-Ipoh Line
PBTParit Buntar AvailableButterworth-Ipoh Line
BGSBagan Serai AvailableButterworth-Ipoh Line
TPGTaiping AvailableButterworth-Ipoh Line
PRGPadang Rengas AvailableButterworth-Ipoh Line
KKSKuala Kangsar AvailableButterworth-Ipoh Line
SGSSungai Siput AvailableButterworth-Ipoh Line
IPHIpoh Southern terminus of the KTM Komuter Northern Sector's Butterworth-Ipoh Line.

Butterworth-Ipoh Line

BTGBatu Gajah Available

Served as the ETS depot, together with the CRRC rolling stock centre.

KMRKampar Available

Serving passengers who are mainly students of Universiti Tunku Abdul Rahman (UTAR) Kampar campus.

TPHTapah RoadAvailable
SUISungkai Available
SLRSlim River Available
 KA15 Tanjung Malim Available

Northern terminus of the KTM Komuter Tanjung Malim-Port Klang Line.

Serving passengers who are mainly students of the Sultan Idris Education University (UPSI).

Tanjung Malim-Port Klang Line

 KA14 Kuala Kubu Bharu AvailableTanjung Malim-Port Klang Line
 KA12 Batang Kali AvailableTanjung Malim-Port Klang Line
 KA10 Rawang AvailableTanjung Malim-Port Klang Line
 KA08 Sungai Buloh Available, elevated

Connecting station to  PY04  MRT Putrajaya Line.

Tanjung Malim-Port Klang Line

 KA07 Kepong Sentral Available

Connecting station to  PY08  Sri Damansara Timur on the MRT Putrajaya Line.

Tanjung Malim-Port Klang Line

 KA02 Kuala Lumpur Available

Connecting station to  KJ14  KG16  Pasar Seni on the LRT Kelana Jaya Line and MRT Kajang Line via a linkbridge.

Batu Caves-Pulau Sebang Line & Tanjung Malim-Port Klang Line

 KA01 KL Sentral Available, elevated

Connecting station, without paid-area integration, to:

Batu Caves-Pulau Sebang Line, Tanjung Malim-Port Klang Line & KL Sentral–Terminal Skypark Line

 KB04 Bandar Tasik Selatan Available, elevated

Connecting station to  SP15  KT2  LRT Sri Petaling Line and ERL KLIA Transit. Exit to Terminal Bersepadu Selatan (TBS) Bus Hub.

Batu Caves-Pulau Sebang Line

 KB06 Kajang Available, elevated

Connecting station to  KG35  MRT Kajang Line.

Proposed connecting station to Putrajaya Monorail.

Batu Caves-Pulau Sebang Line

 KB13 Seremban AvailableBatu Caves-Pulau Sebang Line
 KB17 Pulau Sebang/Tampin Available

Southern terminus of the KTM Komuter Batu Caves-Pulau Sebang Line.

Batu Caves-Pulau Sebang Line

BMLBatang Melaka Available
GMSGemas Available

Southern terminus. Railway services continue to Johor Bahru Sentral and Tumpat via KTM Intercity.

⇄ = cross-platform interchange

CodeNameImageParking baysInterchange/notes
BTWButterworth Available

Northern terminus. Connected to Penang Sentral and the Penang Ferry terminal.

Terminus for the KTM Komuter Northern Sector Butterworth-Ipoh and Padang Besar-Butterworth Lines.

Padang Besar-Butterworth Line & Butterworth-Ipoh Line

BMTBukit Mertajam AvailablePadang Besar-Butterworth Line & Butterworth-Ipoh Line
continue towards south via Nibong Tebal

Ridership

KTM ETS Ridership[2][7][3] [8]
YearRidershipRevenue (MYR)Remarks
20234,115,242N/A
2020951,100N/ATravel restrictions due to COVID-19 pandemic, services reduced
20193,902,000N/A
20183,932,000N/A
20174,148,000174,433,140
20163,565,000145,521,561
20152,059,00060,314,988
20141,693,00044,328,039
20131,563,00040,621,860
20121,180,00031,885,949
2011913,00024,313,451
2010215,0005,569,532Operations began in August


History

First phase

The original KTM Class 91 at Ipoh Railway Station, opened on the first phase.

The service was introduced by Keretapi Tanah Melayu (KTM) on 12 August 2010 between Ipoh and Seremban following the completion of the electrification and double-tracking of the Rawang to Ipoh stretch of the West Coast Line. Its inaugural run was celebrated with an opening ceremony at Kuala Lumpur railway station. Initially, services stretched southwards to Seremban, but the KL Sentral - Seremban sector was taken out of service in October 2012.[9] At launch, there were three service types—Platinum, Gold and Silver. On the fastest Platinum service, the trip was covered in two hours, one hour faster than by car. Gold and silver services had more stops, hence taking up to 2 hours 30 minutes. The route was served solely by 5 Class 91 electric trains.

Second phase

A Class 91 at Bukit Mertajam, opened on the second phase.

The service was extended from Ipoh to Padang Besar via Butterworth, the mainland town opposite George Town, with the introduction of the ETS Transit on 10 July 2015, with stops at 24 stations. At the inception of service, only one train service in both directions was introduced. This service was given the name ETS Transit.

On the following day on 11 July 2015, a new service called the ETS Ekspres between KL Sentral and Padang Besar, via Butterworth was introduced, which only stops at 15 stations. Again, only one service for both directions was introduced[10] although, subsequently, on 1 September 2015, an additional service between KL Sentral and Butterworth was introduced.[11] New rolling stock, the Class 93 trains, were introduced in conjunction with the extended service.

Third phase

The KTM Class 93 ETS train No 203 leaving Pulau Sebang/Tampin, opened on the third phase.

On 10 October 2015, the ETS service was extended southwards from KL Sentral to Gemas with the introduction of a new service between Padang Besar and Gemas.[12] The extension of the KTM ETS service to Gemas utilizes the electrified double-track between Seremban and Gemas which was completed in 2014. This extension of service also saw the ETS service returning to Seremban after being discontinued in 2012.

Also on 10 October 2015, a new service was launched between Butterworth and Padang Besar in addition to existing services but this service was subsequently reduced in frequency and ultimately terminated, with the introduction of the new KTM Komuter Northern Sector.[13]

There were constant revisions of timetables and services as more trains became available, with more train service being added for each of the route segments. The Platinum, Gold, and Silver services were also reintroduced while the terms "ETS Ekspres" and "ETS Transit" were no longer used.

Rolling stock

ClassImageCars per SetIn serviceOn orderManufacturer
KTM Class 91 64-Hyundai Rotem
KTM Class 93 6190CSR Zhuzhou
KTM Class 9460 (1 completed)10CRRC Zhuzhou Locomotive

First Generation

Five KTM Class 91 train sets, each comprising six cars, were purchased by KTM for $67 million (USD). The train sets were designed by the Marubeni Corporation and jointly built by Hyundai Rotem of South Korea and Mitsubishi Electric of Japan.[14] The maximum operational speed of the ETS fleet is 140 km/h (87 mph) but is designed to travel up to 160 km/h (99 mph).[15] The total length of each train set is 138 m and weighs 231.8 tons. Each carriage is 22.95 m long, 2.75 m wide and 4 m high.[16] Each train set has a passenger seating capacity of 350 and includes on-board facilities including toilets, a buffet car, power sockets per two seats and two LED Televisions per car.

Second Generation

A Class 93/2 arriving Kuala Lumpur railway station.

Nineteen sets of KTM Class 93 trains were ordered in two batches to expand the fleet as the electrified network expanded. All 19 trains are in service as of October 2019.

The rolling stock was to have been put into operation for the launch of the ETS Express service between KL Sentral and Padang Besar, and the ETS Transit service between Ipoh and Padang Besar. However, reports of problems during the testing and commissioning of the train sets resulted in the then Malaysian land public transport authority, SPAD, not approving the trains for use in time for the launch of the two services on 10 July 2015 and 11 July 2015.[17] As a result, two KTM Class 91 train sets were used for the time being, one for the ETS Express, and the other for the ETS Transit, allowing for just one trip in each direction for both services.

The first four KTM Class 93 sets went into service on 10 October 2015. All sets from the first batch have entered service.

The second batch differs slightly from the first, with a redesigned livery and a business class coach, a first for ETS services, and started operations with the launch of the new ETS Business Class in October 2019. These coaches were given the name Class 93/2.

Third Generation

A batch of 10 Class 94s was tendered in May 2020 in light with the completion of the Gemas-JB Sentral EDTP[18] modification. The tender was awarded to CRRC Zhuzhou Locomotive, with 8 out of 10 sets being manufactured in Malaysia. The first set was completed on 8 June 2024.

Longest and fastest metre-gauge trains in the world

The ETS trains currently travel up to 140 km/h (87 mph) on the electrified metre gauge rail line. Due to the gauge, the service can be considered a higher speed rail (HrSR) limited-express service.

Similar services operate on 1,067 mm (3 ft 6 in) narrow gauge railways in other parts of the world: the Kuroshio, Shirasagi, Sonic & Thunderbird limited express services in Japan, the Taroko & Puyuma Express in Taiwan, and the Electric & Diesel Tilt Train services in Australia.The only similar metre gauge rail service currently operating is the Renfe Feve on Cercanías Asturias & Euskotren Trena, the Bilbao-Donostia inter-city rail line in northern Spain. This type of inter-state train service is very similar to KTM Komuter Northern Sector regional commuter services.

The ETS thus currently stands as one of the fastest 1,000 mm (3 ft 3+38 in) metre gauge train services in the world, reaching a maximum speed of 140 km/h (87 mph).

On-board service

Interior of the standard class accommodation on KTM Class 93/1.

Standard Class

The seats are arranged in a 2+2 fashion and each seat comes with a tray table and a power outlet. Cluster seats with fixed tables are available on the Class 93. The seats can be easily converted for wheelchair use should the need arise. There are LCD TV screens in every coach for entertainment. Toilets are available in every coach. There are changing tables for infants on the latest Class 93/2. For Muslim passengers, there is a prayer room in every train. There is a bistro coach which sells drinks, light snacks and microwaved meals. This class is available on all trains, and is the only class available on older trains such as the Class 91 and the Class 93/1.

Business Class interior.

Business Class

The Business Class service marks a step-up from the Standard Class. In addition to the facilities already enjoyed in the Standard Class, there are additional features otherwise not seen on the Standard Class. The seats are arranged in a 2+1 configuration and are wider and able to recline up to 45 degrees. The seats can be rotated to face any direction. In addition to a power outlet, a USB port is also provided per seat. Each seat has its own on-demand video screen for in-train entertainment. Wi-Fi is complimentary for Business Class passengers. Each coach has its own steward or stewardess, whom the passengers can summon from their seats. On-board dining is included in the fare. Passengers are also given their own amenity kit. This service is only available on the Class 93/2 trains.

Extension

Gemas – Johor Bahru Sentral

The MYR 8 billion contract was expected to be tendered out by the end of 2008 pending a mid-term review of the Ninth Malaysia Plan. The project would have included building over 200 km (120 mi) of parallel railway tracks, including stations, depots, halts, yards and bridges and cover systems such as electrification, signaling and communications.[19]This included a realignment between of the Pulau Sebang/Tampin - Gemas section.

In May 2009, Global Rail Sdn Bhd, a relatively small contractor and its Chinese partner, China Infraglobe submitted a proposal to the Government to build and upgrade tracks from Gemas to Johor Bahru at a cost of MYR 5 billion. According to them, the project would be on a private finance initiative basis and the plan submitted to the Ministry of Finance later in June 2009 was conditional upon signing over mineral rights in the state of Johor.[20]

On 29 January 2011, then Transport Minister Datuk Seri Kong Cho Ha said that the Gemas - Johor Bahru double-tracking and electrification project was expected to start that year. He added that the Government hoped to appoint the contractor for the project that year and Malaysia was still in the midst of talking with China Railway Construction, but nothing was confirmed yet. Kong said two consultants had been appointed, a design consultant and an independent checker, to monitor the project. The construction of 192 km (119 mi) of tracks, at an estimated cost between MYR 6 billion and MYR 7 billion, would take three years.[21]

On 27 October 2015, the public display exercise, required for all development of new railways under Section 84 of Malaysia's Land Public Transport Act 2010, for the Gemas - Johor Bahru Electrification and Double Tracking Project began and ran until 27 January 2016. The Chinese company CRCC has been awarded to carry out the Gemas - Johor Bahru Electrification and Double Tracking Project. Construction on the project began in January 2018.[22] It was expected to be completed by mid-2023,[23] but on 23 March 2023, it was announced that the extension will be expected to be delayed until mid-2025.[24]

The length of the line to be electrified and double-tracked is 192 km (119 mi) between Chainage 563.040 at Gemas and Chainage 754.180 at JB Sentral. The project includes the construction of 11 stations at Segamat, Genuang, Labis, Bekok, Paloh, Kluang, Mengkibol, Rengam, Layang-Layang, Kulai and Kempas Baru, and three future stations at Tenang, Chamek and Senai. The upgraded line is supposed to cater for at least 22 services daily involving ETS, KTM Intercity and shuttle train services as well as the KTM Komuter.

The documents displayed also stated that the electrification for the stretch will have the same specifications as that of the Seremban-Gemas stretch, at 25 kV AC 50 Hz single phase and supplied via an overhead catenary. Train operations for this stretch will be integrated with the Train Control Centers at KL Sentral and Gemas. The designed maximum speed for the tracks is 160 km/h (99 mph).

ETS services from Padang Besar is scheduled to be operational to Segamat on 1 July 2024, making it the first station from this extension that has begun its operation.

See also

References