The stadium was renovated; its existing football ground including clearing and rearranging drains, rearranging the playing arena to accommodate new 6 lane synthetic track, dismantling and renovating the spectator steps as per necessity, turfing, new chain link fencing to the track, provision of structure for score board etc. for 35th National Games.[2][3][4][5]