Baku Metro

(Learn how and when to remove this message)

Baku Metro (Azerbaijani: Bakı metropoliteni) is a rapid transit system serving Baku, the capital of Azerbaijan. First opened on 6 November 1967[1] when Azerbaijan was part of the Soviet Union, its features are typical of former Soviet systems, including very deep central stations and exquisite decorations that blend traditional Azerbaijani national motifs with Soviet ideology. At present, the system has 40.7 kilometres (25.3 mi)[1] of bidirectional tracks, made up of three lines[1] served by 27 stations.[1] The metro is the only in Azerbaijan. Baku Metro is the fifth metro in the Soviet Union and the thirty-fourth in the world. In 2015, it carried 222.0 million,[3] passengers,[4] an average daily ridership of approximately 608,200. In 2019, it carried 229.7 million,[2] an average daily ridership of 629,315.

Baku Metro
İçərişəhər Metro Station
Overview
Native nameBakı metropoliteni
OwnerBaku Metro CJSC
LocaleBaku, Azerbaijan
Transit typeRapid transit
Number of lines3[1] (2 more planned)
Number of stations27[1] (total 50 more planned - 8 of them under construction)
Daily ridership629,315 (daily average, 2019)
Annual ridershipIncrease 229.7 million (2019)[2]
Chief executiveZaur Huseynov
WebsiteBaku Metro
Operation
Began operationNovember 6, 1967; 56 years ago (1967-11-06) [1]
Operator(s)Bakı Metropoliteni
Number of vehicles228
Technical
System length40.7 km (25.3 mi)[1]
Track gauge1,520 mm (4 ft 11+2732 in) Russian gauge
ElectrificationThird rail, 825V DC
System map

Baku Metro map

Baku Metro Closed Joint-Stock Company (Baku Metro CJSC) or (LLC Limited Liability Company), the company which runs the Baku Metro, was founded according Decree No. 289 Of the President of the Republic of Azerbaijan on February 27, 2014, as a legal successor to Baku Metro and Azertunelmetrotikinti Joint Stock Company. Property along with rights and obligations of Baku Metro and Azertunelmetrotikinti Joint Stock Company were transferred to the newly established Baku Metro CJSC.[5]

Baku Metro
Hazi Aslanov
Ahmedli
Halglar Doslugu
Neftchilar
Gara Garayev
Koroğlu
Ulduz
Bakmil
Nariman Narimanov
Ganjlik
Shah Ismail Khatai
28 May
Jafar Jabbarly
Nizami Ganjavi
Sahil
Elmler Akademiyasi
Icheri Sheher
Inshaatchilar
20 Yanvar
8 Noyabr
Memar Ajami
Avtovağzal
Nasimi
Khojasan
Azadliq prospekti
Darnagul

History

During the final decades of the Russian Empire the port city of Baku became a large metropolis due to the discovery of oil in the Caspian Sea. By the 1930s, it was the capital of the Azerbaijani SSR and the largest city in Soviet Transcaucasia. The first plans for a rapid-transit system date to the 1930s, with the adoption of a new general plan for city development. After World War II, the population passed the one million mark, a requirement of Soviet law for construction of a metro system. In 1947, the Soviet Cabinet of Ministers issued a decree authorizing its construction, which began in 1951. On November 6, 1967, Baku Metro became the Soviet Union's fifth rapid-transit system when the first 6.5 kilometers of track and a depot were inaugurated, in honor of the fiftieth anniversary of the October Revolution.

Baku Subway System 1970

Due to the city's unique landscape, Baku Metro did not have the typical Soviet "triangle" layout of development, and instead had two elliptical lines which crossed each other in the center of the city at the Baku railway station. Thus, one line would begin at the southwestern end of the city, and cross on a northeastern axis to follow the residential districts on the northern edge of the city and then snake along to the southeastern and ultimately southern end. This was inaugurated in three stages: Ulduz (1970) and Neftçilər (1972), followed by Ahmedli (1989) and finally Hazi Aslanov (2002), completing the first line. Additionally, in 1970 a branch was opened to a station built in a depot, Bakmil.

The second line was to parallel the Caspian coast from Hazi Aslanov through Baku's industrial districts, meeting the first line again at the Baku Railway Terminal, and then continuing westwards before turning north to join Baku's northwestern districts. To accelerate construction, a branch was opened from May 28 station to Khatai in 1968, and in 1976 in the opposite direction towards Nizami. The second and first line used the same station (May 28). This posed no serious problems initially, as the line was two stations long, but when the second stage opened in 1985, lengthening the line to 8 stations (Memar Ajemi), construction of a transfer was desperately needed.

Baku Metro Map 2002

In 1993, the first stage of the transfer station Jafar Jabbarli came in operation, but the end of the Soviet Union, political unrest, the First Nagorno-Karabakh War and the financial collapse which followed effectively paralyzed any construction attempts in Baku. Furthermore, during the mid-1990s, three mass casualty incidents took place: on March 19 and July 3, 1994, terrorist attacks killed 27 people and injured another 91, and on October 28 of the following year a fire in a crowded train killed 289 and injured 265 others, the world's deadliest subway disaster.

In the late 1990s, construction restarted. The first project was the completion of Hazi Aslanov station, partly sponsored by the European Union. In the mid-2000s, construction of the northern end of the second line, abandoned since 1994, was restarted with Nasimi station opening on October 9, 2008.

Network

Baku suburban railway and metro map as of 2020
Evolution of Baku Metro

Lines

LineSegmentDate openedLast extensionLengthStations
RedIcheri SheherHazi Aslanov196710 December 200220.1 km13
GreenDarnagulHazi Aslanov197629 June 201112.2 km8
GreenShah Ismail KhataiJafar Jabbarly196827 October 19932.3 km2
PurpleKhojasan8 Noyabr201623 December 20226.1 km4

Timeline

SegmentDate openedLength
Icheri SheherNariman NarimanovNovember 6, 19676.5 km
28 MayShah Ismail KhataiFebruary 22, 19682.3 km
Nariman NarimanovUlduzMay 5, 19702.1 km
Nariman NarimanovBakmilSeptember 25, 1970 (reconstructed in 1978–79)0.5 km
UlduzNeftchilarNovember 7, 19725.3 km
28 MayNizami GanjaviDecember 31, 19762.2 km
Nizami GanjaviMemar AjamiDecember 31, 19856.5 km
NeftchilarAhmedliApril 28, 19893.3 km
Jafar JabbarlyDecember 27, 1993
AhmedliHazi AslanovDecember 10, 20021.4 km
Memar AjamiNasimiOctober 9, 20082.1 km
NasimiAzadliq prospektiDecember 30, 20091.3 km
Azadliq prospektiDarnagulJune 29, 20111.5 km
AvtovağzalMemar AjamiApril 19, 20162.1 km
Memar Ajami8 NoyabrMay 29, 20211.6 km
AvtovağzalKhojasanDecember 23, 20222.4 km
Total27 stations40.7 km

Renaming of stations

OldNewDate of renaming
ŞaumyanXətaiMay 11, 1990
26 Bakı KomissarıSahilApril 9, 1992
XI Qızıl Ordu Meydanı20 YanvarApril 27, 1992
28 Aprel28 MayApril 9, 1992
AvroraQara QarayevApril 27, 1992
ElektrozavodBakmilJanuary 1, 1993
Bakı SovetiİçәrişәhәrApril 25, 2007
Məşədi ƏzizbəyovKoroğluDecember 30, 2011

Expansion plans

At present, there are several expansion projects planned, two of which are under construction. In 2011, the Chief Executive of the Baku Metro, Taghi Ahmadov, announced plans to construct up to 53 new stations by 2030. Currently, eight stations and two train depots are under construction.[6][7][8] These will serve the new bus complex as well as Heydar Aliyev International Airport.[9]

The signalling, supervision and telecommunication systems for Phase 1 of the Purple Line will be upgraded[when?] by Thales.[citation needed]

Three new stations were planned to open by 2015, according to Ahmadov; Avtovağzal Bus Terminal was scheduled to open in late 2012 (delayed to 2016), while Old Gunashli and New Gunashli were planned to begin operating before 2015 (not yet open).[10]

Construction of the intermediate section of the Green Line, between Khatai and Hazi Aslanov along Nobel Avenue, began in August 2013 by a French–Ukrainian consortium.[11][12]

The Baku Metro will be refitted with modern technologies. The new stations will be able to handle trains with up to seven cars. The stations will feature modern platforms, lobbies, and escalators as well as new signalling and control systems.[6]

Most recent updated expansion plan consists of 5 lines, 77 stations and about 119 km total length of network.

Current construction

Baku Metro Map with under construction stations

Lines

LineSegmentDate to openLengthStations
GreenY-17 ↔ Y-18before 20401
GreenShah Ismail Khatai ↔ Y-15~20302
Purple8 November ↔ B-42024-20251.2 km1

Under planning

Lines

LineSegmentDate to openLengthStations
RedIcheri Sheher ↔ Q-3~20402
RedQ-3 ↔ Q-1 (Badamdar)after 20402
RedHazi Aslanov ↔ Q-19 (Zigh)after 20402
GreenDarnagul ↔ Y-1~20303
GreenY-1 ↔ Y-18~20405
GreenY-15 ↔ Y-17~20312
PurpleB-4 ↔ B-8~20404
PurpleB-8 ↔ B-12after 20404
BlueM-1 (Yeni Yasamal) ↔ M-11after 204011
YellowS-1 (Binagadi) ↔ S-11 (Bibiheybat)after 204011

Structural units

Baku Metro Closed Joint-Stock Company embracing such important areas like subway operation and construction, has the following structural units:[13]

  • Traffic service
  • Depot Department
  • Tunnel Facilities Services
  • Traffic Services
  • Electricity Supply Services
  • Electromechanical Service
  • Overhaul Services
  • Alarm and Communication Services
  • Automototransportation Services
  • United workshops
  • Construction Department
  • Human Resources and Services Department
  • Department of Perspective Development and Capital Construction Supervision
  • Department of Finance[13]

Depots

Operation

Officially Baku Metro has two lines, however due to problems with opening the second part of Cəfər Cabbarlı, Baku instead operates as a large four branch system, with trains travelling from Həzi Aslanov to either İçərişəhər or Dərnəgul, branching at May 28 (beneath the main train station). Rare services from both Dərnəgul and İçərişəhər also terminate at Bakmil, but only twice per hour. There is a one-stop second line that operates separately between Cəfər Cabbarlı (essentially different platforms within the same station as May 28) and Şah İsmail Xətai, a shuttle service using only one of the two tracks due to low demand. The second interchange station is “Memar Əcəmi" where Green and Violet Lines cross.[5]

Due to the city's uneven landscape, some stations are very deep, that could double as bomb shelters in case of a nuclear war attack, given that the system was built at the height of the Cold War in the 1950s/early 1960s. All seven of these deep level stations have a standard pylon design. The majority of the system's stations, 13, are shallow pillar-trispans. In addition, one station, Bakmil, is a single platform surface level.

Like many other former Soviet systems, most of the stations of the system are exquisitely decorated; many features advanced Soviet motives in artwork (including mosaics, sculpture and bas-reliefs) and architecture such as those of progress and international culture, whilst others focus on traditional Azeri culture and history. After the collapse of the Soviet Union, several stations were renamed, and some of their decoration was altered to comply with the new ideology.

Ticketing

The system works on a flat fare of 50 gapiks (0.50 AZN) per trip, following a price hike on July 1, 2024. Some Baku residents were reportedly unhappy with the price hike, citing the age of the metro system's infrastructure.[14] Until 2006, metro users accessed the stations with metal (later plastic) tokens placed into turnstiles. In 2006, the Baku Metro introduced an RFID card system using rechargeable fare cards, which require a 2-manat deposit (plus travel credit).[citation needed]

BakuCard is a single Smart Card for payment on Baku Metro and BakuBus.[15] The intercity buses and metro use this type of card-based fare-payment system.[16][17]

Wi-fi and mobile phone coverage

Work to install free wi-fi service at Koroğlu station is now underway.[18]

Local mobile service provider Nar Mobile has started to provide 3G coverage at Sahil, Nəsimi, 28 May, Memar Əcəmi, Azadlıq prospekti and Dərnəgül. Service will expand to all stations as well as to tunnels by May.[19][20]

Rolling stock

As of the beginning of 2020, 81-717/714 (including later modifications .5 .5B and .5M) and their modernized version 81-717M/714M, 81-760B/761B/763B "Oka" and 81-765.B/766.B stock trains are operating on the metro. 81-710 («Еж3») and 81-704/81-705/81-706 («Ем, Ема, Емх») stock trains were also operating on the metro until they were retired in 2008. As well as 81-703 («Е») and 81-707 («Еж») which were retired in 2001. All rolling stock on the Baku Metro has been produced by Metrowagonmash jointly with Alstom.

81-717M/714M Type with old front. (Modernized in Tbilisi, Georgia)
81-717M/714M Type with new front (Modernized locally by Baku Metro)
81-760B/761B/763B "Oka" Type.
81-765.B/766.B "Moscow" Type.

Since 2014, the refurbishment of 81-717/714 (and their modifications .5 .5B and .5M) has been underway in Tbilisi's branch of ZREPS.[21] During the refurbishment, the front car is fitted with a new fibreglass cab end similar to those operating on the Prague Metro. Inside the train, it is fitted with new cab instruments as well as new seats, although the interior is kept relatively the same. Aside from the visual changes, the train is also fitted with new electrical equipment. Since the beginning of the programme the design of the front ends has been altered and now features a different headlamp design and the shape has been slightly changed.[22]

At the end of 2012, Baku Metro loaned one 81-760/761 "Oka" type train to decide whether they will renew the fleet with a new model of train. On January 21, 2013, the train entered service on the Red Line ("Icheri-Sheher" to "Hezi Aslanov"/"Bakmil"). During the trial runs several breakdowns and failures occurred and in July 2013, the train was returned to Moscow.[23] Later, the Baku Metro decided to purchase three five car "Oka" type trains with modified carriages fitted with through passage gangways. But, quickly abandoned the project and switched focus to a redesigned "Oka" type train built by Metrowagonmash and Alstom. The train was classified as 81-760B/761B/763B "Oka" with a modified front end, newer interior equipment and electrical equipment. In April 2015, all three trains were delivered to Baku and began service on the Red line.[24]

In February 2018, Baku Metro signed a contract with Metrovagonmash for the supply of two new 81-765 "Moscow" type trains. The first train was manufactured and shipped to Azerbaijan in March 2018 and from April 20, 2018, it began commercial operation. The trains are classified as 81-765.B/766.B and operate with only motor and head cars, no trailers, in order to increase traction. The second train was shipped in the same year. They are painted in a purple livery similar to the colour of the "Oka" type, just without the gray. As of 2020, five more trains have been delivered to the depot in Baku and are awaiting certification to enter into service.[25][26][27]

Incidents

1994 bombings

On March 19 and July 3, 1994, bombs killed 27 people and injured 91 others.[28] Three Armenians were later arrested, charged and imprisoned in connection with the incident.[29]

1995 fire

On October 28, 1995, a fire broke out between the Ulduz and Nariman Narimanov stations, killing 289 people and injuring 265 others.[30][31] The fire was deemed to have been caused by electrical malfunction, but the possibility of sabotage was not excluded. The fire remains the world's deadliest subway disaster.[32]

See also

References

Metro map

Retrieved from "https:https://www.search.com.vn/wiki/index.php?lang=en&q=Baku_Metro&oldid=1232949804"
🔥 Top keywords: Main PageSpecial:SearchPage 3Wikipedia:Featured picturesHouse of the DragonUEFA Euro 2024Bryson DeChambeauJuneteenthInside Out 2Eid al-AdhaCleopatraDeaths in 2024Merrily We Roll Along (musical)Jonathan GroffJude Bellingham.xxx77th Tony AwardsBridgertonGary PlauchéKylian MbappéDaniel RadcliffeUEFA European Championship2024 ICC Men's T20 World CupUnit 731The Boys (TV series)Rory McIlroyN'Golo KantéUEFA Euro 2020YouTubeRomelu LukakuOpinion polling for the 2024 United Kingdom general electionThe Boys season 4Romania national football teamNicola CoughlanStereophonic (play)Gene WilderErin DarkeAntoine GriezmannProject 2025