The AvonLink is a rural passenger train service in Western Australia operated by Transwa between Midland and Northam.

AvonLink
AvonLink railcars going under the Great Eastern Highway bridge in Swan View in October 2009
Overview
Service typePassenger train
StatusOperational
LocaleWestern Australia
First service24 September 1995
Current operator(s)Transwa
Former operator(s)Westrail (1995-2000)
WAGR Commission (2000-2003)
Ridership7,057 (year to June 2022)
Route
TerminiMidland
Northam
Distance travelled97 kilometres
Average journey time1 hour 20 minutes
Service frequencyDaily (weekdays only)
Line(s) usedEastern
Technical
Rolling stockWEA/WEB railcar
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Route map
Map

History

The consideration of revitalising passenger services in 1993 saw the Avonlink Ministerial Committee formed by Minister for Transport Eric Charlton.[1]

The first AvonLink service departed Northam for East Perth on 24 September 1995, and was significant, as it was the first new country passenger rail service in Western Australia for 47 years.[dubiousdiscuss][2][3] From July 2001, the Perth terminus moved from East Perth to Midland where a connection is made with Transperth Midland line services.[4]

In June 2004, the AvonLink was extended to Merredin on three days a week, operating as the MerredinLink.[5] In September 2006, Transwa trialed a day trip Sunday service to Northam.[6] The six-week trial proved popular with each service being fully booked out weeks in advance. However, due to overall lack of passengers at other times the service was discontinued.

In August 2013, Transwa announced the AvonLink would cease on 30 December 2013 due to poor patronage and be replaced by a road coach.[7] However, this announcement generated significant criticism. On 19 November 2013, two Wheatbelt region MLAs, Mia Davies and Shane Love, presented petitions to the WA State Parliament calling for the retention of the AvonLink. The petitions bore a total of more than 3,000 signatures of Avon Valley residents.[8][9][10]

On 3 December 2013, Minister for Transport Troy Buswell announced the AvonLink service would be retained, initially for a period of six months, while Transwa and the Wheatbelt Development Commission worked through the funding solution required to keep the service running beyond that initial period.[10][11]

In May 2014, it was announced that an enhanced service would continue until at least June 2017.[12][13]

In December 2014, an enhanced service was introduced with services increased from one to three trains on certain days.[14] From July 2017, the AvonLink was reduced back to one service in each direction on weekdays only.[15]

Services

As at June 2022, one Avonlink service operates on weekdays in each direction between Midland and Northam stopping at Toodyay.[16]

Rolling stock

The service commenced with WCA/WCE railcars built in 1971 to operate The Prospector.[17][18]

In December 2000 Westrail awarded a contract to United Goninan, Broadmeadow for 9 WDA/WDB/WDC railcars to replace the 1971 built stock. 3 WDA/WDB and 1 WDC were for The Prospector and 2 WEA/WEB were for the AvonLink and MerredinLink services.[19][20] The new train entered service on 1 August 2005.[3]

Ridership

The AvonLink had 7,057 passengers in the year leading up to June 2022.[21]